And now the real dig begins

part of Urban Archaeology

And now the real dig begins
download file

The test pit showed great promise, so it was time to grid off the site to do further digging. I began with a line of string at the 6 inch mark. Alas, most of the debris underneath the line was larger than six inches, and I quickly realized that this was not practical.

Close